Development History
2024

•  Annual production capacity of 100,000 three-in-one electric drive assemblies line (completed)

•  Serial production of 3-in-1 electric drive assemblies (already in mass production), range extenders, controllers, etc.

•  SiC power module production line construction in the vicinity of Hefei

•  Lab received CNAS (completed), ISO 26262 functional safety certification

2023

•  SiC power module production base opens in Shanghai with an annual production capacity of 200,000 motor controllers, line completed.

•  250kW SiC high-voltage 3-in-1 electric drive assembly wins Customer's Project Selection and completes its first batch delivery.

•  Hybrid range-extender power generation assembly also wins Customer's Project Selection and finishes sample delivery.

2022

•  SiC single motor controllers were mass produced and completed the first batch of product delivery

•  High standard laboratory put into use

2021

•  SiC power module development and trial completed development

•  SiC multi-fusion power domain controller development completed

•  SiC single-motor controller completed

2020

•  Hefei J-Link Automotive Electronics Co.,Ltd. was established in Hefei City

2019

•  Built the third generation power semiconductor application laboratory

•  Built the third generation power semiconductor application laboratory

•  Development of OBC, DC-DC and 1200V SiC MOSFET modules